The 1,200-meter-long multi-layer pipe rack of Hinvar Chemical is being installed in an orderly manner.
2023-05-29
The 1,200-meter-long multi-layer pipe rack of Hianhua Chemical is being installed in a tight and orderly manner, striving to contribute to the strength of Huilong for the customer's production and operation as scheduled.